SAP S/4HANA, Production Planning (PP) is a core module that enables organizations to efficiently align market demand with available manufacturing capacity, ensuring optimal resource utilization and timely delivery of products. It integrates demand management, material requirements planning (MRP), and capacity planning to generate accurate production and procurement schedules for both finished goods and component materials. In a live S/4HANA PP environment, detailed master data is maintained, including manufacturing plant locations, storage locations within the plants, and associated work centers. This real-time visibility into plant and storage structures allows for streamlined material flow, improved coordination across departments, and enhanced decision-making, ultimately driving operational excellence in the manufacturing process.
Course Syllabus
| Aug 4th | MON – FRI (60 DAYS) ONLINE | Timings – 08:00 PM to 09:00 PM (IST) | |
| Aug 4th | MON – FRI (60 DAYS) ONLINE | Timings – 07:00 AM to 08:00 AM (IST) |
Request Information
- Understand SAP S/4HANA PP Fundamentals
Gain a clear understanding of Production Planning concepts in the S/4HANA environment.
Learn the integration of PP with other SAP modules (MM, SD, QM, FICO).
Configure and Manage Master Data
Set up Material Master, Bill of Materials (BOM), Work Centers, and Routing in S/4HANA.
Maintain production versions and manage master data consistency.
Plan and Control Production
Execute demand management, material requirement planning (MRP), and capacity planning.
Work with make-to-order and make-to-stock production scenarios.
Perform Shop Floor Execution
Create and manage production orders.
Post goods issues, confirmations, and goods receipts for production orders.
Utilize Advanced S/4HANA Features
Leverage Fiori apps for production planning and monitoring.
Understand embedded analytics for real-time production insights.
Optimize Production Processes
Apply best practices for reducing lead time, controlling costs, and improving efficiency.
Identify and resolve bottlenecks using S/4HANA tools.
Hands-on Practical Skills
Perform end-to-end configuration and execution of production planning processes in a live SAP S/4HANA system.
Simulate real-world business scenarios to build confidence in handling production operations.
1. Roles
Professionals working on the PP module may have different designations based on the project stage and organizational needs:
SAP PP Consultant
SAP PP Functional Analyst
Production Planner (Business User)
SAP PP Support Consultant
Integration Consultant (PP with MM, SD, QM, PM)
2. Key Responsibilities
For SAP PP Consultant / Functional Role
Requirement Gathering & Analysis
Interact with business stakeholders to understand production processes.
Gather requirements for discrete manufacturing, process manufacturing, or repetitive manufacturing.
Identify integration touchpoints (MM, SD, QM, PM, FI/CO).
Configuration & Master Data Setup
Configure material master, BOM (Bill of Materials), work centers, routing, and production versions.
Set up MRP parameters, planning strategies, and production scheduling profiles.
Define capacity planning and shop floor control settings.
Process Implementation
Map business processes to SAP S/4HANA PP functionalities (e.g., Make-to-Stock, Make-to-Order, Repetitive Manufacturing).
Implement MRP Live for faster planning runs.
Configure order types, scheduling, and cost tracking.
Integration Management
Ensure seamless integration with MM (materials), SD (sales), QM (quality), and PM (plant maintenance).
Coordinate with FI/CO for production cost postings.
Testing & Validation
Prepare and execute unit testing, integration testing, and user acceptance testing.
Validate MRP results, production orders, and lead time calculations.
End-User Training & Documentation
Conduct workshops and training sessions for planners and production supervisors.
Prepare functional specification documents and training manuals.
Post-Go-Live Support
Provide hypercare support.
Resolve issues related to production orders, MRP runs, and capacity planning.
Implement process improvements based on feedback.
3. Methodology (Typical SAP S/4HANA PP Implementation Approach)
The PP module implementation generally follows the SAP Activate Methodology, which consists of the following phases:
Phase 1 – Discover
Understand client manufacturing requirements.
Identify business value drivers for PP in S/4HANA.
Assess current production planning processes.
Phase 2 – Prepare
Conduct requirement workshops.
Finalize scope (discrete, repetitive, or process manufacturing).
Set up initial system landscape.
Phase 3 – Explore
Perform fit-gap analysis between standard SAP PP functionality and client needs.
Create solution design documents.
Demonstrate prototype with sample data.
Phase 4 – Realize
Configure master data and transactional processes.
Set up BOMs, routings, production versions, MRP settings, and capacity planning.
Perform unit and integration testing.
Phase 5 – Deploy
Migrate master and transactional data from legacy systems.
Train end-users on production planning processes.
Conduct User Acceptance Testing (UAT).
Go-live and start production tracking in the system.
Phase 6 – Run
Monitor system performance and fix production planning issues.
Optimize planning parameters for efficiency.
Continuous improvement through business feedback.
Production Planners and Shop Floor Executives who want to streamline manufacturing processes using SAP S/4HANA.
Manufacturing Managers seeking to improve production efficiency, scheduling, and resource utilization.
SAP Consultants (Functional/Technical) aiming to specialize in the PP module.
ERP Professionals looking to upskill or transition into SAP S/4HANA projects.
Freshers & Graduates with an interest in manufacturing, supply chain, or ERP systems.
Business Analysts involved in production and material planning processes.
End Users from manufacturing companies who need hands-on expertise in SAP S/4HANA PP functionalities.
With this training, participants will gain the skills to handle Master Data, MRP, Production Orders, Capacity Planning, and Integration with other SAP modules like MM, SD, and QM.
Understanding SAP S/4HANA PP module architecture and integration with other modules (MM, SD, QM).
Mastery of Master Data in PP: Material Master, Bill of Materials (BOM), Work Centers, and Routing.
Demand Management and planning strategies in S/4HANA.
Material Requirement Planning (MRP) processes and configuration.
Production Order management – creation, release, scheduling, confirmation, and settlement.
Capacity Planning – managing work center loads and scheduling.
Integration of Shop Floor Control with production execution.
Understanding Kanban, Repetitive Manufacturing, and other production scenarios in S/4HANA.
Utilizing Fiori apps for PP-related processes in S/4HANA.
Basic reporting and analytics in PP using Embedded Analytics.
Hands-on practice with real-time case studies and business scenarios.
Basic Business Process Knowledge
Understanding of manufacturing processes such as discrete, process, or repetitive production.
Familiarity with production planning concepts like BOM (Bill of Materials), routing, work centers, and scheduling.
ERP Fundamentals
General awareness of how ERP systems work and their role in integrating business processes.
Preferably, some exposure to SAP ERP terminology and navigation.
Basic Knowledge of Logistics Modules (optional but beneficial)
Familiarity with related modules like MM (Materials Management) and SD (Sales & Distribution) will help understand end-to-end scenarios.
Computer Skills
Comfort with using business software, spreadsheets, and data entry.
Industry Background (optional but advantageous)
Experience in manufacturing, supply chain, or production operations is a plus.
Instructor-led Sessions
45 Hours of Online Live Instructor-Led Classes. Weekend Classes : 24 sessions of 2 hours each. Weekday Classes: 25 sessions of 1 hours each.
Real-life Case Studies
Live project based on any of the selected use cases, involving implementation of the various concepts.
Assignments
Each class will be followed by practical assignments.
Lifetime Access
You get lifetime access to LMS where presentations, quizzes, installation guide & class recordings.
24 x 7 Expert Support
We have 24×7 online support team to resolve all your technical queries, through ticket based tracking system, for the lifetime.
Certification
After completing your final course project successfully emax will provide you certificate as a SAP Trainee.
Forum
We have a community forum for all our learners that further facilitates learning through peer interaction and knowledge
- SAP Generation Shift
- Product Journey to S/4 Hana
- SAP Different Modules
- SAP S/4 Hana
- Release and Nomenclature
- SAP S/4 Hana Database Basics
- Logistic End to End Process Flow
- Projects with SAP S/4 HANA
- Project Users and Roles
- Project Methodology (ASAP vs ACTIVATE)
- GUI- Graphical User Interface,
- Fiori Apps
- NWBC
- Enterprise Structure
- Company-Controlling Area Setup Plant Setup
- FICO/MM/PP Baseline Configuration
- Basics of Product Costing
- Integration between PP & CO
- Product Cost estimate
- Cost mark up and release
- Material Master,
- BOM, Work Center, Routing & PV
- Product Cost Estimate
- PP End to End Process Flow
- Material Master Data
- BOM- Technical Types
- PP Master Data-Work Center
- PP Master Data-Routing
- PP Master Data-Production Version
- Production Order Backflush
- Production Scheduling Profile
- Production Order Auto Goods Receipt
- Demand Management
- MRP- Material Requirement Planning
- Classic MRP vs MRP Live
- MTS vs MTO
- MTO Planning (20)
- MTS Net Req. Planning (10)
- Gross Req. Planning (11)
- Planning with Final Ass. (40)
- Planning with Final Ass. (59 & 50)
- Planning with Final Ass (60)
- Production by Lot – 30
- Planning at Ass Level- 70
- Planning at Phantom Assembly-59
- Planning w/o Final Assembly- 50
- Planning with Planning Material-60
- How to Use two planning strategies for the same material
- Repetitive Manufacturing (REM)
- Process Difference in REM & Discrete
- REM Configuration
- REM End to End Process
- REM vs Discrete Mfg.
- Batch Management Configuration
- Manual Batch Determination for Production Order
- Automatic Batch Determination for Production Order
- Standard SOP- Material
- Standard SOP- Product Group
- Flexible Planning Vs Standard SOP
- Flexible SOP
- Kanban End to End Cycle
- Classic Kanban
- Stock Transfer
- Externally Procurement
- Capacity Planning
- Capacity Levelling
- SAP S/4 Hana
- Release and Nomenclature
- SAP S/4 Hana Database Basics
- SAP S/4 Hana D/B- Temperature Layers
- Main and Delta Table Storage
- Why Data Footprint Reduction?
- Data Footprint Reduction
- Column and Row Data structure
- Fiori End to End Life Cycle
- How to Create Catalogue, Business Group, Role and assign to User
- Fiori Architecture
- Material Master Data Simplification
- BOM Simplification
- PP Master Data-Work Center
- PP Master Data-Routing
- Production Version Simplification
- PP End to EPP End to End Process Flow with Fiori Applications
- Shop floor Management with S/4 Hana
- Fiori Analytical applications for Production
- Embedded Analytics for Production Planning
- By-product & Co-product Basics
- By-product Scenario
- Co-product Scenario
- Co Product apportionment
- Basics of MRP
- MRP LIVE
- Classic MRP vs MRP Live
- MRP Area Basics
- MRP Area S/4 HANA Simplifications
- Plant MRP Area, Storage Location MRP Area & Subcon
- MRP Area Scenario
- DDMRP (Demand Driven MRP)
- Basic of DDMRP
- DDMRP Prerequisites
- DDMRP Calculations & Formulas
- Details of Bull whip effect and DLT
- DDMRP Configuration
- DDMRP End to End Cycle
- Long Term Planning (LTP)
- Predictive Material and Resource Planning (pMRP)
- pMRP Fiori Applications
- Basic of Variant Configuration
- Master Data in Variant configuration
- Variant configuration in Make to Order
- Variant Configuration in Make to Stock
- Basics of PPDS
- Scenarios covered by PPDS
- PPDS Architecture embedded with S/4 Hana
- Basics of PPPI
- Master Data for PP-PI
- Basic Configurations for SAP PP-PI
- Basics of QM
- QM & PP Integration
- Integrated Process flow with PP & QM
1. Importance of SAP SD ON S/4 HANA Project
Crucial for a company’s revenue and customer operations, as it manages the end-to-end “Order-to-Cash” process, improving efficiency, customer satisfaction, and integrating key business functions.
2. Types of SAP SD ON S/4 HANA Projects
- Implementation: New, from-scratch setup.
- Rollout: Adapting a global template to a new location.
- Upgrade: Migrating from an older system (ECC) to S/4HANA.
- Support: Ongoing maintenance, bug fixes, and user issue resolution.
3. Role of SD Consultant
Acts as a bridge between business requirements and the SAP system, responsible for configuration, customization, testing, and training in each project phase.
4. Naming & Coding Standards
Strict conventions (e.g., using Z or Y prefixes) are used for all custom configuration and development to ensure system consistency and maintainability.
5. Project Documents
- FS (Functional Specification): Describes the business requirement for a custom solution.
- TS (Technical Specification): Translates the FS into a technical development plan.
- UTP (Unit Test Plan): Outlines test cases to verify the solution.
- Issue Logs: Tracks all bugs and defects throughout the project.
6. Code & Quality Tools
- Code Inspector/EPC: Tools to check custom code for performance, security, and quality.
- Code Review: A manual process to ensure code meets project standards.
7. SD Objects & Concepts
An SD consultant analyzes business needs to determine the correct technical approach, from basic reports and BDC for data entry to advanced BAPIs, User Exits, and IDocs for system integration and enhancements.
8. Ticket Resolution
In support, consultants analyze, troubleshoot, and resolve end-user issues (“tickets”) to meet service level agreements (SLAs), ensuring business continuity.
9. Resume Preparation
A good resume should highlight SAP SD ON S/4 HANA skills, project experience (with quantifiable achievements), and certifications, tailored to the specific job description.
Course Syllabus
It was a wonderful learning experience with EMAX Technologies. Their support feature is really good for active learners. I have completed the UI5/Fiori on S/4HANA training.
I have taken the training on UI5/Fiori on S/4HANA from EMAX Technologies. I would say the course went good and faculties are very experienced. Customer services are also very good and very interactive. In future, if I want to learn any courses, I’m sure that I will approach EMAX Technologies only. Thanks to all.
Your access to the Support Team is for lifetime and will be available 24/7. The team will help you in resolving queries, during and after the course.
Post-enrolment, the LMS access will be instantly provided to you and will be available for lifetime. You will be able to access the complete set of previous class recordings, PPTs, PDFs, assignments. Moreover the access to our 24×7 support team will be granted instantly as well. You can start learning right away.
Yes, the access to the course material will be available for lifetime once you have enrolled into the course.