SAP PP ON S/4HANA Training In Mumbai

SAP S/4HANA, Production Planning (PP) is a core module that enables organizations to efficiently align market demand with available manufacturing capacity, ensuring optimal resource utilization and timely delivery of products. It integrates demand management, material requirements planning (MRP), and capacity planning to generate accurate production and procurement schedules for both finished goods and component materials. In a live S/4HANA PP environment, detailed master data is maintained, including manufacturing plant locations, storage locations within the plants, and associated work centers. This real-time visibility into plant and storage structures allows for streamlined material flow, improved coordination across departments, and enhanced decision-making, ultimately driving operational excellence in the manufacturing process.

Upcoming Batches
Aug 4thMON – FRI (60 DAYS) ONLINETimings – 08:00 PM to 09:00 PM (IST) 
Aug 4thMON – FRI (60 DAYS) ONLINETimings – 07:00 AM to 08:00 AM (IST)
Description
What are the course objectives?
  • Understand SAP S/4HANA PP Fundamentals
      • Gain a clear understanding of Production Planning concepts in the S/4HANA environment.

      • Learn the integration of PP with other SAP modules (MM, SD, QM, FICO).

    • Configure and Manage Master Data

      • Set up Material Master, Bill of Materials (BOM), Work Centers, and Routing in S/4HANA.

      • Maintain production versions and manage master data consistency.

    • Plan and Control Production

      • Execute demand management, material requirement planning (MRP), and capacity planning.

      • Work with make-to-order and make-to-stock production scenarios.

    • Perform Shop Floor Execution

      • Create and manage production orders.

      • Post goods issues, confirmations, and goods receipts for production orders.

    • Utilize Advanced S/4HANA Features

      • Leverage Fiori apps for production planning and monitoring.

      • Understand embedded analytics for real-time production insights.

    • Optimize Production Processes

      • Apply best practices for reducing lead time, controlling costs, and improving efficiency.

      • Identify and resolve bottlenecks using S/4HANA tools.

    • Hands-on Practical Skills

      • Perform end-to-end configuration and execution of production planning processes in a live SAP S/4HANA system.

      • Simulate real-world business scenarios to build confidence in handling production operations.

What are the roles and responsibilities and methodology of this module?

1. Roles

Professionals working on the PP module may have different designations based on the project stage and organizational needs:

  • SAP PP Consultant

  • SAP PP Functional Analyst

  • Production Planner (Business User)

  • SAP PP Support Consultant

  • Integration Consultant (PP with MM, SD, QM, PM)


2. Key Responsibilities

For SAP PP Consultant / Functional Role

  1. Requirement Gathering & Analysis

    • Interact with business stakeholders to understand production processes.

    • Gather requirements for discrete manufacturing, process manufacturing, or repetitive manufacturing.

    • Identify integration touchpoints (MM, SD, QM, PM, FI/CO).

  2. Configuration & Master Data Setup

    • Configure material master, BOM (Bill of Materials), work centers, routing, and production versions.

    • Set up MRP parameters, planning strategies, and production scheduling profiles.

    • Define capacity planning and shop floor control settings.

  3. Process Implementation

    • Map business processes to SAP S/4HANA PP functionalities (e.g., Make-to-Stock, Make-to-Order, Repetitive Manufacturing).

    • Implement MRP Live for faster planning runs.

    • Configure order types, scheduling, and cost tracking.

  4. Integration Management

    • Ensure seamless integration with MM (materials), SD (sales), QM (quality), and PM (plant maintenance).

    • Coordinate with FI/CO for production cost postings.

  5. Testing & Validation

    • Prepare and execute unit testing, integration testing, and user acceptance testing.

    • Validate MRP results, production orders, and lead time calculations.

  6. End-User Training & Documentation

    • Conduct workshops and training sessions for planners and production supervisors.

    • Prepare functional specification documents and training manuals.

  7. Post-Go-Live Support

    • Provide hypercare support.

    • Resolve issues related to production orders, MRP runs, and capacity planning.

    • Implement process improvements based on feedback.


3. Methodology (Typical SAP S/4HANA PP Implementation Approach)

The PP module implementation generally follows the SAP Activate Methodology, which consists of the following phases:

Phase 1 – Discover

  • Understand client manufacturing requirements.

  • Identify business value drivers for PP in S/4HANA.

  • Assess current production planning processes.

Phase 2 – Prepare

  • Conduct requirement workshops.

  • Finalize scope (discrete, repetitive, or process manufacturing).

  • Set up initial system landscape.

Phase 3 – Explore

  • Perform fit-gap analysis between standard SAP PP functionality and client needs.

  • Create solution design documents.

  • Demonstrate prototype with sample data.

Phase 4 – Realize

  • Configure master data and transactional processes.

  • Set up BOMs, routings, production versions, MRP settings, and capacity planning.

  • Perform unit and integration testing.

Phase 5 – Deploy

  • Migrate master and transactional data from legacy systems.

  • Train end-users on production planning processes.

  • Conduct User Acceptance Testing (UAT).

  • Go-live and start production tracking in the system.

Phase 6 – Run

  • Monitor system performance and fix production planning issues.

  • Optimize planning parameters for efficiency.

  • Continuous improvement through business feedback.

Who should go for this training
  • Production Planners and Shop Floor Executives who want to streamline manufacturing processes using SAP S/4HANA.

  • Manufacturing Managers seeking to improve production efficiency, scheduling, and resource utilization.

  • SAP Consultants (Functional/Technical) aiming to specialize in the PP module.

  • ERP Professionals looking to upskill or transition into SAP S/4HANA projects.

  • Freshers & Graduates with an interest in manufacturing, supply chain, or ERP systems.

  • Business Analysts involved in production and material planning processes.

  • End Users from manufacturing companies who need hands-on expertise in SAP S/4HANA PP functionalities.

With this training, participants will gain the skills to handle Master Data, MRP, Production Orders, Capacity Planning, and Integration with other SAP modules like MM, SD, and QM.

What are the skills that you will be learning with this course?
  • Understanding SAP S/4HANA PP module architecture and integration with other modules (MM, SD, QM).

  • Mastery of Master Data in PP: Material Master, Bill of Materials (BOM), Work Centers, and Routing.

  • Demand Management and planning strategies in S/4HANA.

  • Material Requirement Planning (MRP) processes and configuration.

  • Production Order management – creation, release, scheduling, confirmation, and settlement.

  • Capacity Planning – managing work center loads and scheduling.

  • Integration of Shop Floor Control with production execution.

  • Understanding Kanban, Repetitive Manufacturing, and other production scenarios in S/4HANA.

  • Utilizing Fiori apps for PP-related processes in S/4HANA.

  • Basic reporting and analytics in PP using Embedded Analytics.

  • Hands-on practice with real-time case studies and business scenarios.

What are the prerequisites to learn this course?
  • Basic Business Process Knowledge

    • Understanding of manufacturing processes such as discrete, process, or repetitive production.

    • Familiarity with production planning concepts like BOM (Bill of Materials), routing, work centers, and scheduling.

  • ERP Fundamentals

    • General awareness of how ERP systems work and their role in integrating business processes.

    • Preferably, some exposure to SAP ERP terminology and navigation.

  • Basic Knowledge of Logistics Modules (optional but beneficial)

    • Familiarity with related modules like MM (Materials Management) and SD (Sales & Distribution) will help understand end-to-end scenarios.

  • Computer Skills

    • Comfort with using business software, spreadsheets, and data entry.

  • Industry Background (optional but advantageous)

    • Experience in manufacturing, supply chain, or production operations is a plus.

Key Features

Instructor-led Sessions

45 Hours of Online Live Instructor-Led Classes. Weekend Classes : 24 sessions of 2 hours each. Weekday Classes: 25 sessions of 1 hours each.

Real-life Case Studies

Live project based on any of the selected use cases, involving implementation of the various concepts.

Assignments

Each class will be followed by practical assignments.

Lifetime Access

You get lifetime access to LMS where presentations, quizzes, installation guide & class recordings.

24 x 7 Expert Support

We have 24×7 online support team to resolve all your technical queries, through ticket based tracking system, for the lifetime.

Certification

After completing your final course project successfully emax will provide you certificate as a SAP Trainee.

Forum

We have a community forum for all our learners that further facilitates learning through peer interaction and knowledge

Preview
SAP ERP & SAP S/4 Hana Basics:
  • SAP Generation Shift
  • Product Journey to S/4 Hana
  • SAP Different Modules
  • SAP S/4 Hana
  • Release and Nomenclature
  • SAP S/4 Hana Database Basics
SAP PP Process Flow & Project Methodology:
  • Logistic End to End Process Flow
  • Projects with SAP S/4 HANA
  • Project Users and Roles
  • Project Methodology (ASAP vs ACTIVATE)
User Interface
  • GUI- Graphical User Interface,
  • Fiori Apps
  • NWBC
Enterprise Structure, Company Code and Plant Setup
  • Enterprise Structure
  • Company-Controlling Area Setup Plant Setup
  • FICO/MM/PP Baseline Configuration
Product Costing
  • Basics of Product Costing
  • Integration between PP & CO
  • Product Cost estimate
  • Cost mark up and release
PP End to End Process with GUI
  • Material Master,
  • BOM, Work Center, Routing & PV
  • Product Cost Estimate
  • PP End to End Process Flow
PP Master Data
  • Material Master Data
  • BOM- Technical Types
  • PP Master Data-Work Center
  • PP Master Data-Routing
  • PP Master Data-Production Version
Backflush & Auto GR
  • Production Order Backflush
  • Production Scheduling Profile
  • Production Order Auto Goods Receipt
Demand Management Classic MRP vs MRP Live
  • Demand Management
  • MRP- Material Requirement Planning
  • Classic MRP vs MRP Live
Planning Strategy
  • MTS vs MTO
  • MTO Planning (20)
  • MTS Net Req. Planning (10)
  • Gross Req. Planning (11)
  • Planning with Final Ass. (40)
  • Planning with Final Ass. (59 & 50)
  • Planning with Final Ass (60)
  • Production by Lot – 30
  • Planning at Ass Level- 70
  • Planning at Phantom Assembly-59
  • Planning w/o Final Assembly- 50
  • Planning with Planning Material-60
  • How to Use two planning strategies for the same material
Repetitive Manufacturing (REM)
  • Repetitive Manufacturing (REM)
  • Process Difference in REM & Discrete
  • REM Configuration
  • REM End to End Process
  • REM vs Discrete Mfg.
Batch Management
  • Batch Management Configuration
  • Manual Batch Determination for Production Order
  • Automatic Batch Determination for Production Order
Sales Operation & Planning
  • Standard SOP- Material
  • Standard SOP- Product Group
  • Flexible Planning Vs Standard SOP
  • Flexible SOP
  • Kanban End to End Cycle
KANBAN
  • Classic Kanban
  • Stock Transfer
  • Externally Procurement
Capacity Planning:
  • Capacity Planning
  • Capacity Levelling
SAP S/4 Hana Database Basics & Data footprint Reduction:
  • SAP S/4 Hana
  • Release and Nomenclature
  • SAP S/4 Hana Database Basics
  • SAP S/4 Hana D/B- Temperature Layers
  • Main and Delta Table Storage
  • Why Data Footprint Reduction?
  • Data Footprint Reduction
  • Column and Row Data structure
Fiori End to End Life Cycle:
  • Fiori End to End Life Cycle
  • How to Create Catalogue, Business Group, Role and assign to User
  • Fiori Architecture
PP Master Data S/4 Hana Simplifications:
  • Material Master Data Simplification
  • BOM Simplification
  • PP Master Data-Work Center
  • PP Master Data-Routing
  • Production Version Simplification
PP End to End Process Flow With FIORI:
  • PP End to EPP End to End Process Flow with Fiori Applications
  • Shop floor Management with S/4 Hana
  • Fiori Analytical applications for Production
  • Embedded Analytics for Production Planning
By-product & Co-product:
  • By-product & Co-product Basics
  • By-product Scenario
  • Co-product Scenario
  • Co Product apportionment
MRP Live:
  • Basics of MRP
  • MRP LIVE
  • Classic MRP vs MRP Live
MRP Area:
  • MRP Area Basics
  • MRP Area S/4 HANA Simplifications
  • Plant MRP Area, Storage Location MRP Area & Subcon
  • MRP Area Scenario
DDMRP:
  • DDMRP (Demand Driven MRP)
  • Basic of DDMRP
  • DDMRP Prerequisites
  • DDMRP Calculations & Formulas
  • Details of Bull whip effect and DLT
  • DDMRP Configuration
  • DDMRP End to End Cycle
LTP and pMRP (Predictive MRP):
  • Long Term Planning (LTP)
  • Predictive Material and Resource Planning (pMRP)
  • pMRP Fiori Applications
Variant Configuration:
  • Basic of Variant Configuration
  • Master Data in Variant configuration
  • Variant configuration in Make to Order
  • Variant Configuration in Make to Stock
PPDS Overview:
  • Basics of PPDS
  • Scenarios covered by PPDS
  • PPDS Architecture embedded with S/4 Hana
PP-PI Overview
  • Basics of PPPI
  • Master Data for PP-PI
  • Basic Configurations for SAP PP-PI
QM Overview:
  • Basics of QM
  • QM & PP Integration
  • Integrated Process flow with PP & QM
SAP SD ON S/4 HANA Project
Importance Of SAP SD ON S/4 HANA Project

1. Importance of SAP SD ON S/4 HANA Project

Crucial for a company’s revenue and customer operations, as it manages the end-to-end “Order-to-Cash” process, improving efficiency, customer satisfaction, and integrating key business functions.

2. Types of SAP SD ON S/4 HANA Projects

  • Implementation: New, from-scratch setup.
  • Rollout: Adapting a global template to a new location.
  • Upgrade: Migrating from an older system (ECC) to S/4HANA.
  • Support: Ongoing maintenance, bug fixes, and user issue resolution.

3. Role of SD Consultant

Acts as a bridge between business requirements and the SAP system, responsible for configuration, customization, testing, and training in each project phase.

4. Naming & Coding Standards

Strict conventions (e.g., using Z or Y prefixes) are used for all custom configuration and development to ensure system consistency and maintainability.

5. Project Documents

  • FS (Functional Specification): Describes the business requirement for a custom solution.
  • TS (Technical Specification): Translates the FS into a technical development plan.
  • UTP (Unit Test Plan): Outlines test cases to verify the solution.
  • Issue Logs: Tracks all bugs and defects throughout the project.

6. Code & Quality Tools

  • Code Inspector/EPC: Tools to check custom code for performance, security, and quality.
  • Code Review: A manual process to ensure code meets project standards.

7. SD Objects & Concepts

An SD consultant analyzes business needs to determine the correct technical approach, from basic reports and BDC for data entry to advanced BAPIsUser Exits, and IDocs for system integration and enhancements.

8. Ticket Resolution

In support, consultants analyze, troubleshoot, and resolve end-user issues (“tickets”) to meet service level agreements (SLAs), ensuring business continuity.

9. Resume Preparation

A good resume should highlight SAP SD ON S/4 HANA skills, project experience (with quantifiable achievements), and certifications, tailored to the specific job description.

Reviews

It was a wonderful learning experience with EMAX Technologies. Their support feature is really good for active learners. I have completed the UI5/Fiori on S/4HANA training.

MadhuSowmya.B Student

I have taken the training on UI5/Fiori on S/4HANA from EMAX Technologies. I would say the course went good and faculties are very experienced. Customer services are also very good and very interactive. In future, if I want to learn any courses, I’m sure that I will approach EMAX Technologies only. Thanks to all.

Sai Ram Banala Student

I have very great experience with the UI5/Fiori on S/4HANA training at EMAX Technologies. The instructor was a professional trainer with good practical experience.

Satya Student
FAQs
What if I miss a class?
You will never miss a lecture at Emax You can choose either of the option: View the recorded session of the class available in your LMS

 

What if I have queries after I complete this course?

Your access to the Support Team is for lifetime and will be available 24/7. The team will help you in resolving queries, during and after the course.

How soon after Signing up would I get access to the Learning Content?

Post-enrolment, the LMS access will be instantly provided to you and will be available for lifetime. You will be able to access the complete set of previous class recordings, PPTs, PDFs, assignments. Moreover the access to our 24×7 support team will be granted instantly as well. You can start learning right away.

Is the course material accessible to the students even after the course training is over?

Yes, the access to the course material will be available for lifetime once you have enrolled into the course.

Delivered By

Mr.Chirag R
Mr.Chirag R Sr. SAP ABAP ON S/4HANA Consultant
17+ Years of Experience

Get An Enquiry

+91 1234567890

Scroll to Top